28.09.2024 | Maintenance/revision of transformer station | POWER SWITCHING RUD 16
Dear Madam or Sir,
in order to ensure the operation of the institute buildings at Rudower Chaussee 16 and Rudower Chaussee 18 and to comply with legal requirements, maintenance and inspection of the transformer station is urgently required.
The work is to be carried out on Saturday, 28.09.2024.
This will require a complete power cut. The entire power supply in the building will be interrupted. The voltage switch-off will take place between 08:00 and approx. 13:00.
Please DO NOT BE IN THE BUILDINGS during this time.
We therefore ask you to switch off or disconnect sensitive electrical equipment, in particular server and computer technology with standby functions, but also control systems for technical operating systems, from the mains as a purely precautionary measure during this period, as voltage peaks may occur when the transformers are switched off and on.
Voltage peaks can occur when the transformers are switched on and off, which can destroy electrical devices. If you are unsure, please ask.
Please note that the existing UPS cannot bridge this period. Elevators will be switched off. Telephones behind the switchboard (all telephones) are out of service.
Please inform all your working groups and employees about this project.
With energy-saving friendly regards.
Thomas Förtig
Humboldt Universität zu Berlin
Technische Abteilung
Herr Förtig, VB 3-3
Sitz: Ziegelstr. 12
10117 Berlin
Postanschrift:
Unter den Linden 6
10099 Berlin
Tel. 030 2093 99957
Funk 0160 3645 628
Fax 030 2093 99941
thomas.foertig@uv.hu-berlin.de